MISSION
Marc Rayman,
Chief Engineer, JPL
Chief Engineer, JPL
Dawn Journal
July 6, 2007
Dear Dawnpours,
Just after the previous log was posted, further predictions of poor weather at Cape Canaveral and difficulties with a downrange launch vehicle tracking system required a launch postponement. We will provide an update when the countdown is ready to resume.
Dr. Marc D. Rayman
July 6, 2007
| << Previous entry | All entries | Next entry >> |